NORWALK, Conn. – Bridges, a step toward a sidewalk repair program, protection for City Hall and the urgent replacement of the pumps at the sewage treatment plant, even if they are only 2 years old, are among the things the Norwalk Department of Public Works is seeking money for through the 2015-16 capital budget.
Those requests and more were explained Thursday by Department of Public Works Director Hal Alvord, Principal Engineer Dick Linnartz and Property Manager Mike Sgobbo at a Planning Commission capital budget review. This preceded the release of Finance Director Thomas Hamilton’s recommended $21.7 million FY15-16 capital budget, of which $17.1 million will be paid for by tax dollars.
The $3 million sewage treatment plant pumps will be paid for by Water Pollution Control Authority (WPCA) fees.
Alvord and Linnartz made pitches for everything from a refurbishment of the City Hall community room to beginning steps in sidewalk refurbishment, something that Mayor Harry Rilling promised to look into during his campaign.
The price tag for fixing the worst urban sidewalks – those that are rated poor or completely deteriorated – is $12 million, the men said, quoting a draft version of the study on urban area sidewalks that was commissioned by the Common Council Public Works Committee.
Note – that’s the worst sidewalks. The sidewalks that are only “fair” are not included in that estimate.
DPW requested $1 million for sidewalks, which Hamilton has recommended for approval.
“When I prepared this budget request I didn’t have that information,” Linnartz said. “So we took a stab and said let’s do a $1 million a year … combine that with the $500,000 a year (for sidewalks in conjunction) with the paving program and we have an $8 million 5-year capital program, which I am still very comfortable with. But we have a massive task and we have been requested to do this and it’s basically setting up a program, the same as our road paving program.”
While there are 140 miles of sidewalks in Norwalk, the study and resultant plan only address those in the urban zone, which roughly corresponds to the First and Second Taxing Districts, they said.
Hamilton has recommended spending $706,000 on City Hall. That includes putting in a PA system, and a security notification system that ties together computers and cell phones.
“There is a growing concern on the part of the employees and management and the staff that the building is vulnerable because it is an open building, it conducts city governance day in and day out,” Sgobbo said.
The desire to refurbish the community room – new lighting, new audio visual system and an upgrade of the kitchen equipment – drew some questions from Planning Commission Vice Chairwoman Frances DiMeglio.
She said she could understand wanting new chairs and refurbished wood, but “Why the kitchen?”
“That was a special request, Fran,” Alvord said. “We are responding to special requests.”
“How did this come up?” she asked.
“A special request,” he said.
“OK,” she said, giving up. “In this austere budget season. OK.”
Rilling said in a Sunday email that the “special request” did not come from him. The community room refurbishment is not included in Hamilton’s recommended budget.
Hamilton did recommend $503,000 for the roof but don’t expect work to begin soon, even if it’s leaking here and there. Alvord is getting one third of the money for the project from this year’s budget to add to the one third he got last year. Then next year the final third should fall into place.
“Big numbers scare people,” he said. Hence, the installment program.
The roof had a life expectancy of 25 years and is about 35 years old, he said. The request includes the idea that the construction could be done in phases. “Being honest with you, it’s a dumb way to do construction,” Alvord said.
Other items include:
Bridges
The recommended budget includes $296,000 for the Perry Avenue Bridge over the Norwalk River. It does not include the $250,000 requested to design improvements for the Glover Avenue Bridge.
The money for the Perry Avenue Bridge is the city’s 20 percent share of the funding; the federal government will pay the rest. This is in addition to $1 million that DPW has already been awarded in capital budget cycles, Linnartz said.
Construction should begin in July and continue over two summers, Linnartz said. It includes widening Main Avenue and putting in a turn lane, which has increased the cost and necessitated an additional appropriation, he said. It will include new crosswalks on Main Avenue and the railroad gate will need to be rebuilt.
“It’s been a long journey, 5-6-7-8 years, but are at the mercy of the state, when they have the money they’ll let us bid project,” Linnartz said.
Fleet replacement
The department requested $770,000.
“Our request this year is considerably lower than normal,” Alvord said. “We usually request about $1 million because that’s been the shape of our fleet. But we started about 11 years ago our fleet standardization program and now it’s paying dividends. We only got $870,000 anyway because that’s the magic number our finance director thought we needed each year. No matter what our request was it was $870,000. We don’t even need $870,000 this year.”
Hamilton recommends $330,000 – a $220,000 37,000-pound dump truck, a $45,000 F-550 dump truck, a $40,000 flatbed truck and $25,000 worth of equipment to look inside drainage pipes.
Not included are a wood chipper or a “trackless machine.”
“Given our staffing level we can’t clear the streets and do sidewalks at the same time when it snows,” Alvord said. “We only have enough people to put in the snow plows so we have to wait until our streets are done, then we give people some sleep and then start t clear sidewalks, and we don’t have the most efficient snow clearing equipment.”
That includes a snow blower and a Bobcat, which has to be transported around the city on a trailer, he said.
“This trackless machine can actually run on the highway so it will be a lot more efficient and get sidewalks done a lot more quickly,” Alvord said.
Traffic signals
The recommended budget includes $250,000 for traffic signal repair, the entire amount requested. That will be added to $1 million that DPW has accumulated to replace eight traffic lights, Linnartz said.
The city has replaced traffic signals in the urban core because they were eligible for federal funding. Now that that is done the staff is free to replace signals in the other parts of the city.
You may remember that the traffic signal at Main and Wall Streets fell over last summer due to corrosion from within.
“We are urgently looking to get these other projects done,” Linnartz said. “… Then we start building up money for the next cycle.”
“We are still going to chase more on the federal grants for traffic signal upgrades,” Alvord said.
WPCA
The city is in litigation with Flowserve over the failure of six pumps at the sewage treatment plant, which were part of the $87 million 2012 upgrade for the plant. Flowserve is refusing to honor its warranty, even though the city has independent experts who say Norwalk has done nothing wrong, Alvord said. There is a court date set for January 2016, he said.
“In order to prevent environmental and public health issues, new pumps and appurtenances are needed,” DPW’s request reads.
“We have to get those things replaced,” Alvord said. “Fortunately we have not had 10 inches of rain in a day, that’s when all six pumps have to be operational, when you’ve got 90 million gallons going through the plant.”
Flowserve and Flygt, the two premier suppliers of the pumps, both bid on the project, Alvord said. Now the city will buy replacements from Flygt.
“We have Flygt at all of our 22 pumping stations and they are extremely reliable,” Alvord said. “But this was the low bid. We were using clean water funds administered by the state DEEP (Department of Energy and Environmental Protection) so we had to go with the low bid. So we went with the low bid not anticipating there was going to be an issue because again, Flowserve is a national corporation, it has a pretty good reputation.”
The WPCA is also recommended to get $1 million to repair the hydraulics on Ely Avenue and Bouton Street sewer lines. The Ely Avenue sewer main goes uphill, gets plugged up frequently and is35 feet below the surface in rock ledge, Alvord said.
“We’re probably going to do something like a pumping station in the area,” he said.
The WPCA will repay the city out of its user fees.









Leave a Reply
You must Register or Login to post a comment.